Calore Trattamento Requisiti Per Cilindro Tubi
Feb 28, 2024
Control of Unqualified Cylinders In the production process of steel cylinders, it is inevitable that some unqualified products will appear. Manufacturers of unqualified cylinders and gas cylinders should also control them to ensure that unqualified cylinders are recorded, isolated and dealt with. Some slightly problematic cylinders were repaired and re-inspected. Batches of unqualified cylinders should be recorded in the cylinder files in a timely manner to provide effective information for future cylinder technology reforms. There are two main reasons for the failure of the cylinder heat treatment: there is a problem with the equipment during the cylinder heat treatment, resulting in the heat treatment effect not meeting the standard; in the later stage of the cylinder heat treatment, the cylinder inspection does not meet the relevant regulations. The treatment method for unqualified cylinders is as follows: If there is an error in the cylinder test, resampling can be carried out for a second test; if the test procedure is correct, the staff should analyze the reasons for the test failure and repair or scrap the cylinder if necessary; Carry out inspection on the cylinder During heat treatment, the wall thickness of the cylinder should be checked to ensure that the wall thickness of the cylinder is qualified.








